As a homeowner, why do I have to get a Site Development Permit if I want to put fill on my own property?
Placement and/or excavation of fill, increasing or decreasing the amount of pervious area, and changing topographic elevations on a parcel of land may change the drainage characteristics and flow patterns for stormwater runoff within or from the parcel. Stormwater management policies dictate that calculated stormwater runoff volumes from a 25-year storm event (storm event that has a statistical probability of occurring once every 25 years) must be retained on the property where the project is located.

The Town's Engineering Division, as well as the appropriate drainage authority, have a duty is ensure that proposed projects are in compliance with standard design criteria and the stormwater retention policy. The Town's Engineering permit application process is utilized to track, review and (if necessary) modify project plans where drainage impacts to adjacent parcels, waters of the State, and/or the Town's Right-of-Way (ROW) may be realized.

Show All Answers

1. Why do I need a Water Management District’s stamp and/or approval for engineering submittals to the Town?
2. As a homeowner, why do I have to get a Site Development Permit if I want to put fill on my own property?
3. As a homeowner, what must I submit to receive a Site Development Permit to put fill on my own property?
4. When is a Clearing and Grubbing Permit required?